| PROJECT HIGHLIGHTS |
| |
ROLLER
GATES AND STO LOGS FOR SMART PROJECT,
KUALA LUMPUR
|
- Design, Fabricate, Installation and
Commissioning of Roller Gates and Stoplogs
at Intake from Attenuation Pond (Location
9) and Outfall to Sungai Kerayong (Location
10) for Stormwater Management and Road
Tunnel (Smart) Project, Kuala Lumpur.
- Design, Fabrication, Installation
and Commissioning of Roller Gates and
Stoplogs at Tunnel Outfall (Location
8) for Stormwater Management and Road
Tunnel (Smart) Project, Kuala Lumpur
.
- Construction started in Jul 2004
and still in progress.
- Client: MMC - GAMUDA JV
|
|
|
Installation of Hydraulic Cylinder
- Smart Tunnel
|
| |
|
|
|
|
Installation of Roller Gate
|
| |
|
| |
|
|
|