| PROJECT HIGHLIGHTS |
| |
HAIFU
COMBINED CYCLE POWER PLANT, TAIWAN
|
|
|
Thermal Block 12 and
Diffuser in Position |
Installation of Air
Intake Filter House
|
| |
|
- Mechanical Erection of 4 x 160 MW ABB
K24 Gas Turbines and 2 x 160 MW Steam
Turbine, Balance of Plant and Piping
at Haifu, Taiwan R.O.C.
- Supply of Manpower for Modification
and maintenance work in Haifu Combined
Cycle Power Plant, Taiwan R.O.C.
- Construction Started in 1998
and ended in 1999
- Cleint: Asea Brown Boveri (Now
known as Alstom Power Asia Pacific)
- Peak Manpower: 350
|
|
Steam Turbine Low
Pressure Rotor Alignment
|
| |
| |