Project
(Location) |
Client |
Status |
 |
Haifu Power Station –
Taiwan
- Mechanical Erection of 4 x 160
MW ABB K24 Gas Turbines and 2
x 160 MW Steam Turbine, Balance
of Plant and Piping.
|
Asea
Bowin Boveri
(Now known as
Alstom Power Asia Pacific) |
1998
- 1999 |
| |
 |
Senoko Power Station
– Singapore
- Mechanical Erection of 1 x 250
MW ABB GT 26 Gas Turbines and
associated auxiliaries and piping
works.
|
Alstom
Power Asia Pacific Sdn Bhd |
2000 |
| |
 |
Senoko Power Station
– Singapore
- Electrical Installation of
1 x 250 MW ABB GT 26 Gas Turbines,
1 x 120 MW rehabilitated Steam
Turbine and associated systems.
|
Alstom
Power Asia Pacific Sdn Bhd |
2000 |
| |
 |
Pahlawan Power Station
– Melaka
- Rehabilitation of Melaka Pahlawan
Power Station.
|
Pahlawan
Power Station Sdn Bhd |
2000 |
| |
 |
Bang Bo Power Plant –
Thailand
- Design and build Site Office
for Bang Bo Power Plant in Thailand.
|
Alstom
Power (Thailand) Ltd |
2000 |
| |
 |
Samsung Corning –
Seremban
- Installation of a new and relocation
of LEHR conveyor/dryer line.
|
Samsung
Engineering Sdn Bhd |
Mar
2001 |
| |
 |
Samsung Corning –
Seremban
- Relocation and Installation
of Trolley Conveyor.
|
Samsung
Engineering Sdn Bhd |
May
2001 |
| |
 |
Haifu Combined Cycle
Power Plant – Taiwan
- Supply of manpower for Modification
work.
|
Asea
Bowin Boveri
(Now known as
Alstom Power Asia Pacific) |
May
2001 |
| |
 |
Senoko Power Plant –
Singapore
- Supply of manpower for Commissioning
work.
|
Alstom
Power Asia Pacific Sdn Bhd |
June
2001 |
| |
 |
Segari Power Plant –
Lumut, Perak
- Mechanical and
Electrical Installation of 3 x
145 MW 13E2 Gas Turbine and Balance
of Plant.
|
Alstom
Power Asia Pacific Sdn Bhd |
June
2001 |
| |
 |
Segari Power Plant –
Lumut, Perak
- Mechanical and Electrical Erection
of 3 x KA 13E2 Heat Recovery Steam
Generator.
|
Alstom
Power Asia Pacific Sdn Bhd |
Aug
2001 |
| |
 |
Haifu Combined Cycle
Power Plant – Taiwan
- Supply of manpower for maintenance
works.
|
Asea
Bowin Boveri (Now known as Alstom
Power Asia Pacific) |
Dec
2001 |
| |
 |
Segari Power Plant –
Lumut, Perak
- Mechanical and Electrical Erection
of 3 x KA 13E2 Steam Turbine,
Balance of Plant and Piping.
|
Alstom
Power Asia Pacific Sdn Bhd |
Jan
2002 |
| |
 |
Senoko Power Plant –
Singapore
- Supply of Manpower for Modification
Work of 1 x 250 MW Alstom GT26.
|
Alstom
Power Asia Pacific Sdn Bhd |
May
2002 |
| |
 |
Perlis Power Plant –
Perlis
- Mechanical and Electrical Erection
of 3 x KA 13E2 Heat Recovery Steam
Generator.
|
Alstom
Power Asia Pacific Sdn Bhd |
Oct
2002 |
| |
 |
Perlis Combined Cycle
Power Plant – Perlis
- Mechanical and Electrical Erection
Works for 675MW 3 x KA 13E2
Gas Turbines, Steam Turbine, Balance
of Plant and Piping.
|
Alstom
Power Asia Pacific Sdn Bhd |
Nov
2002 |
| |
 |
Segari Power Plant –
Lumut, Perak
|
Alstom
Power Asia Pacific Sdn Bhd |
Jun
2004 |
| |
 |
Stormwater Management and Road
Tunnel (SMART) Project –
Kuala Lumpur
- Design, Fabricate, Installation
and Commissioning of Roller Gates
and Stoplogs at Intake from Attenuation
Pond (Location 9) and Outfall
to Sungai Kerayong (Location 10).
|
MMC
- GAMUDA JV |
Jul
2004
In Progress |
| |
 |
JOR, WOH, HABU and ODAK Power
Stations – Cameron Highlands,
Pahang
- Manufacturing, assembly, testing,
disassembly, transportation and
site installation of equipment
to the Power Stations Cooling
Water and Drainage Systems (Part
A).
|
Siemens
Malaysia Sdn Bhd |
Jul
2004
In Progress |
| |
 |
JOR, WOH, HABU and ODAK
Power Stations – Cameron
Highlands, Pahang
- Mechanical and Electrical Rehabilitation.
|
Siemens
Malaysia Sdn Bhd |
Aug
2004
In Progress |
| |
 |
Stormwater Management
and Road Tunnel (SMART) Project
– Kuala Lumpur
- Design, Fabrication, Installation
and Commissioning of Roller Gates
and Stoplogs at Tunnel Outfall
(Location 8).
|
MMC
- GAMUDA JV |
Dec
2005
In Progress |
| |
 |
Teluk Salut Power Station
– Kota Kinabalu, Sabah
- Erection of Mechanical Equipment
– Heat Recovery Steam Generator,
Steam Turbine, Air Cooled Condenser
and Other Plant Equipment for
Teluk Salut 190MW Combined Cycle
Conversion Project.
|
Ranhill
Engineers and Contractors Sdn Bhd |
Mar
2006
In Progress |
| |
 |
Tuanku Jaafar Power Station,
Port Dickson Rehabilitation Project
Phase 2
- Project and Site Management
for Mechanical & Electrical
Erection of 750MW Combined Cycle
Power Plant.
|
TPSC
Engineering (M) Sdn Bhd
K&P Sikojaya
Sdn Bhd |
Mar
2007
In Progress |
| |
 |
SembCorp Cogeneration
Plant C Jurong Island, Singapore
- 1 x 400tph Gas Fired Boiler Site
Mechanical & Electrical Erection at SembCorp
Cogeneration Plant, Jurong Island.
|
Austrian
Energy & Environment (Australia)
Pte. Ltd |
Apr
2007
In Progress |