Installation
of thermocouples / RTD and thermocouple
Type "K" cables -
Segari Power Plant |
Installation
of cableway and cables to motors in
lube oil block - Segari Power Plant |
|
|
|
|
Installation
of instrument juction box in Gas Turbine
- Segari Power Plant |
Installation
of power cables, control cables and
instrument air tubing to control valves -
Segari Power Plant |
|
|
|
|
Installation
of cableway in module cellar - Segari
Power Plant |
Installation
of LV switchgear - Segari Power Plant |
|
|
|
|
Purification
of transformer oil for Main Step-Up
Transformer ST34 - Segari
Power Plant |
Erection of
IPB Bus Duct for Unit ST34 - Segari
Power Plant |
|
|
|
|
Termination
of Control Cables in Marshalling Cubicle
at MCR - Segari Power Plant |
Installation
of desks and large screen in Main Control
Room - Segari Power Plant |
|
|
|
|
Termination
of LV Cable in LV Swithgear - Perlis
Power Plant |
Completed
generator Step Up Transformer Unit
Steam Turbine ST18 - Perlis
Power Station |
| |
|
|
|
Erection
of Generator Output & Neutral
Point Cubicle unit 11 - Perlis
Power Station |
Installation
of instrument air tubing, control cable
for control valves in WSC -Perlis Power
Plant |
|
|
|
|
Installation
of local temperature indicator in WSC
- Perlis Power Plant |
Installation
of pressure transmitter & instrument
tubing in WSC - Perlis Power Plant |