Erection
of Thermal Block - Rigging - Segari
Power Plant |
Complete
Air Intake Filter House - Segari
Power Plant |
|
|
|
|
Assembly
of Stack Ring - Segari Power Plant |
Installation
of Round to Square Transition -
Segari Power Plant |
|
|
|
|
Installation
of EV & SEV ring line - Senoko
Power Plant |
Generator
into position - Senoko Power Plant |
|
|
|
|
Check
Gas Turbine Bearing No. 4 - Senoko
Power Station |
Preparation
for rigging in Gas Turbine
- Senoko Power Plant |
| |
|
|
|
Generator-
Haifu Power Station |
Installation
of Diffuser of Gas Turbine
- Haifu Power Station |
|
|
|
|
Lifting
of heavy equipment - Haifu Power
Station |
Rigging
of Thermal Block - Haifu Power Plant |