|
|
Installation
of top cover for Steam Turbine Generator
- Segari Power Plant |
Re-installing
Low Pressure Inner Casing Upper Part
- Segari Power Plant |
|
|
|
|
Installation
of Low Pressure Steam Valve Block - Segari
Power Plant |
Installation
of High Pressure Steam Valve Block
- Segari Power Plant |
|
|
|
|
Condenser
- Haifu Power Station |
Low Pressure
Casing - Haifu Power Station |
|
|
|
|
Lifting of
Steam Turbine onto Foundation - Teluk
Salut Power Plant |
Positioning
of Steam Turbine Generator (85 tons)
- Teluk Salut Power Plant |
|
|
|
|
Fuel gas preheating
system - Perlis Power Plant |
Steam Turbine Generator - Perlis Power Plant |
|
|